Contract Awarded for the Met Branch Trail Extension to Fort Totten

A bird’s eye rendering of the Met Branch Trail around the Fort Totten Metro (Source DDOT)
This morning, the District Department of Transportation (DDOT) announced a key milestone for the extension of the Metropolitan Branch Trail (MBT) from Brookland to Fort Totten. After a long procurement process, DDOT
awarded the contract to complete the design and construct the next phase of the popular multi-use trail!
This new trail will extend the sidepath on the east side of John McCormack Dr to the base of the hill across from the Fort Totten waste transfer station. Instead of turning up the hill, as it does today, the trail will continue north alongside the train tracks. At the Fort Totten Metro, the trail will climb up and over the Green Line tunnel portal, descend to street level and continue on First Pl NE towards Riggs Rd.

Existing MBT in green, new segment in blue, interim on street route in red (Source Google Maps)
This phase of construction will add nearly a mile of new trail, improving walking and biking access to the Fort Totten transit hub and the new development surrounding it. The project will include stairs for a direct route down to the Metro entrance and an improved trail through Fort Totten Park westward to Gallatin St, where the interim MBT route continues to Silver Spring. The new 10-12 foot wide trail will include lights and a relatively gradual grade compared to the steep climb up Fort Totten Dr. For more renderings and detailed design drawings, go to
metbranchtrail.com/resources/.
When complete, the Met Branch Trail will span more than 8 miles between Union Station and the Silver Spring Metro Station. So far, the southern 5.5 miles are a mix of off-street trail, protected bike lane, and low traffic streets. Once built out from Bates Rd to Fort Totten, about 2 miles will remain to be built through
Ward 4 to the Maryland line. Completing final design and construction should take roughly 18 months or by spring 2019. This new timeline is almost a year behind the
schedule published in May 2016.
Page last updated by Greg Billing on November 2, 2017.
You must be logged in to post a comment.