Hundreds of people speak up for a better Long Bridge

The Long Bridge is a rail bridge across the Potomac River, and it’s getting an upgrade from two tracks to four. This project represents a once-in-a-century opportunity to create a new, continuous biking and walking connection from Crystal City to DC’s waterfront core. Unfortunately, the current designs only go halfway. You can find more info here.

Last month, we encouraged people to take action and contact the District Department of Transportation (DDOT), the agency overseeing the project. Their assessing the environmental impact of the project, so it was an an ideal time to speak up for better bicycling connections.

And speak up you did! Throughout the month of January, more than 1600 people contacted DDOT and let them know that the river isn’t the only barrier for people who walk and bike. A better trail bridge would consider and provide solutions for getting past two major highways and the tangle of dangerous intersections, congested sidewalks, and freeway ramps that separate DC from Arlington.

WABA was proud to stand with numerous other groups and elected officials that sent official comment letters to DDOT, including Arlington County, DC Bicycle Advisory Council, Councilmember David Grosso, DC Recreational Trails Advisory Committee, Rails-to-Trails Conservancy, Southwest Business Improvement District, and Fairfax Alliance for Better Bicycling.

A public and agency update is planned for sometime this spring. Sign up for WABA’s advocacy updates if you want to stay up to date on this project!