Upcoming Project Meetings in the District

Construction crews are on their winter breaks, but the District Department of Transportation (DDOT) and Virginia Railway Express (VRE) are ramping up planning on a number of projects relevant to people who bike in the District. Please consider attending these meetings this month and speaking up for the needs of bicyclists.

 

Alabama Avenue SE Corridor Safety Study
Saturday, February 11, 2017 | 10 am – 12:30 pm
THEARC 1901 Mississippi Avenue, SE

DDOT is hosting the first meeting to discuss safety along the Alabama Avenue SE corridor.  DDOT aims to identify and address multimodal safety concerns and to improve the overall quality of the network for all users.  At this meeting, existing conditions and current traffic/crash data will be shared to capture ideas and suggestions from participants. Alabama Ave is an important bike corridor and would make an ideal protected bike lane corridor.

Tactical Urbanism at North Capitol Street and Lincoln Road
Monday, February 13, 2017 | 6:30 –  8 pm
NoMa BID Lobby 1200 First Street, NE

DDOT invites you to a meeting to discuss the Tactical Urbanism project at North Capitol Street and Lincoln Road, NE. The purpose of this project is to increase safety at the North Capitol/Lincoln Road, NE intersection through immediate, short-term improvements that will lead the way for a larger intersection safety project. DDOT will present a draft design concept and gather comments from the community at this public meeting. Rapid implementation of safety projects like this are a key part of DC’s Vision Zero Action Plan.

VRE Midday Storage Facility Public Meeting
Thursday, February 16, 2017 | 4:00 – 7:30 pm | Presentation at 4:30pm and 6:30pm
Bethesda Baptist Church 1808 Capitol Ave NE

Virginia Railway Express intends to replace its current storage space leased from Amtrak at the Ivy City Coach Yard in DC with a new storage yard alongside New York Avenue. The project will include planning, designing, and constructing a permanent midday storage facility for VRE trains that travel into the District from Virginia. VRE will work with members of the community, stakeholders, and property owners to assess potential impacts and determine ways VRE can be a good neighbor.

Florida Avenue Multimodal Transportation Project
Tuesday, February 21, 2017 | 6:30 pm – 8 pm | Presentation at 6:30 pm
New Samaritan Baptist Church 1100 Florida Avenue NE

DDOT will share 30% designs for multimodal transportation improvements along Florida Avenue NE from First Street NE to H Street/Benning Road NE. This project will add new wider sidewalks, bike lanes, new signalized crossings and streetscape improvements for a safer street. In the last project update in March 2016, DDOT’s preferred alternative eliminated many of the popular and safety-critical elements such as protected bike lanes and a road diet to curtail speeding. We hope that a year of work has found opportunities to point the project in the right direction.

New York Avenue Streetscape and Trail Project
Thursday, February 23, 2017 | 6 – 8 pm | Presentation at 6:30 pm
Gallaudet University’s I. King Jordan Student Academic Center 800 Florida Avenue, NW (map)

DDOT is in the early stages of planning significant streetscape improvements to beautify New York Avenue from Florida Avenue to Bladensburg Road. The project will study improvements to public space in the corridor, including curb, gutter, streetlights, plantings, trees, benches, public art and other public space improvements. Additionally, DDOT will develop concepts and designs to improve safety and quality of life for people who use New York Avenue, including a new multi-use trail connecting the National Arboretum and Metropolitan Branch Trail, and future transit services throughout the corridor. Read more at the project website.

Let’s Talk About The Met Branch Trail

 

Support the Met Branch Trail at the upcoming public meeting on March 21st.Photo credit: DDOT DC

Here’s your chance to discuss the Met Branch Trail with DDOT—

The District Department of Transportation (DDOT) and Advisory Neighborhood Commission 4B will hold a joint meeting on the preliminary design of the Metropolitan Branch Trail from Brookland to Takoma Park on Saturday, March 21.

You can attend the meeting to show your support for the trail. Representatives from DDOT will present the trail alignment and solicit feedback from the general public.

The Metropolitan Branch Trail is a planned eight-mile, paved bicycle and pedestrian trail from Union Station in Ward 6 to Silver Spring, Md. The portion between Union Station and Brookland in Ward 5 is very popular, averaging more than 500 users a day. Design is underway for the section that’s north of Brookland. The new section, as currently proposed, will run along the railroad tracks from Bates Road to the Ft. Totten Metro station, then along First Place, Riggs Road, First Street, all in Northeast, and Blair Road, NW.

Comments on the preliminary design, as well as requests for more information should be directed to Jim Sebastian at jim.sebastian@dc.gov.

WABA will host an informal happy hour on Thursday, March 19th from 6 pm to 8 pm at Simple Bar in Brightwood. We want to connect you with other trail supporters, answer your questions so that you can feel prepared for the public meeting. WABA advocacy staff will be available at the happy hour to discuss the Met Branch Trail project or other advocacy priorities. We hope you can attend both the happy hour and trail open house.

Metropolitan Branch Trail Open House
Saturday, March 21, 2015, 1 pm to 4 pm
Metropolitan Police Department – Fourth District Station
6001 Georgia Avenue NW, Washington, DC 20011
Google Map directions

WABA Met Branch Trail Happy Hour
Thursday, March 19, 2015, 6 pm to 8 pm
Simple Bar
5828 Georgia Ave NW, Washington, DC 20011
Google Map directions

RSVP for the WABA Happy Hour

Please help us show strong community support for completion of the northern section of the Met Branch Trail.